Crossing Control Centres
Description
Pictures of the Crossing Control Centres in Athlone and Mallow.
Each centre can control up to 96 CCTV Crossings.
The control centres run on Industrial PLC’s that are SIL4 certified.
The control centres communicate and control each individual level crossing over Irish Rails internal Fibre Optic Network.
Athlone Crossing Control Room
Mallow Crossing Control Room